Showing posts with label Demolition. Show all posts
Showing posts with label Demolition. Show all posts

Thursday, May 5, 2011

What's Behind Curtain Number 1?

Turns out, more curtains...

The soda shop style bar stools at the bar are quaint but difficult to work on and are slowly deteriorating.  I've called them a "Law Suit Waiting to Happen".  (I don't drink that much and even I've had, shall we say, "trouble" with the bar stools.)  So, they have to go.

First step: Get rid of them!

Second step is...  Uh, I guess there is no second step.

We started getting rid of them on Monday.  First, we had to remove the carpet and reveal some of the structure to see what the heck was going on under there.  And it turns out it'll be fairly easy to remove.  Under the carpet is some delightful vinyl flooring.  I'm sure it matched beautifully with the pink and turquoise the building used to be painted.

My!  What lovely vinyl floor covering!


We have some nice ideas for what to do with the area down there below the bar on the customer side and, for the most part, you'll have to wait to know what that is until later.

From this point in removing the bar stools, we decided it'd be easiest with electricity. There's some wood that'll need to be removed and that'll be easiest with a circular saw.  Electricity should be available in about a week.  Until then, here are some pictures to entertain yourself with.


Don't touch that!  You don't know where it's been!

Bryan getting ripped.

Saturday, April 30, 2011

Finishing the Job

Today, Karl's at the bar supervising the installation of the final truss that should have been installed four weeks ago.  Why is Karl supervising?  Because the contractor apparently doesn't supervise his own employees and with the changes made to the framing plans specific strapping and connectors are required to help prevent the roof from flying off in the event of, let's call it, a "wind event".

And it's a good thing Karl's there.  Demo Guy had given his crew the wrong information on how to install the truss he should have installed four weeks ago.  They were doing some kind of bizarre plan to make the studs in the wall line up with the vertical members of the truss instead of what the engineer designed, we (the client) agreed to, and the city approved.

Had Karl not been at the bar to stop the (unsupervised) crew, either Demo Guy would have to come back out again and fix what he had done or we would have had to go back through the process of revising the plans again.  One wonders if this guy is trying to keep this job going forever. 

There are other issues with this contractor that we will get resolved on Monday.  If all goes to plan, that is.  If all doesn't go to plan, it'll be resolved within 45 days or so.

We think it'll be resolved on Monday; it's in everybody's best interest.  We'll be done with this guy and he'll be done with us.  I'm sure we'll all be happier for it.

Wednesday, April 13, 2011

Not-So-Lovely Rain and Other Bullstuff

(It's a long one; better strap yourself in.)

As you know, we got our building permit on Monday, March 21. That week, it rained pretty heavily so construction couldn't begin immediately. We had been in contact with the Demo Guy (our demolition and construction contractor; not his real name) and he said he'd be ready to start on March 28.

Well, March 28 rolls around and he's not done with the previous job. He blamed it on the rain the previous week. Seems fairly reasonable. Said he would be able to start on Wednesday and that he wanted to meet with Karl on Tuesday to go over the job one final time before getting crews there.

Also on March 28, the A/C guy was going to come and remove the on-roof A/C unit for cleaning and storage during the demolition. He comes with a crane and removes the unit. And that took pretty much all day so it's probably good that Demo Guy wasn't ready to start on the 28th.

Demo Guy and Karl meet on Tuesday to go over the job and Demo Guy says he'd have his crew start on Thursday. On Wednesday, Karl spent a lot of the day at the bar doing "stuff". Fixing stucco problems, building fences where there weren't fences before and that sort of thing.

Thursday rolls around and Demo Guy still isn't ready to start and he'd start on Friday. We start to see a pattern.

That pattern is reinforced on Friday, April 1, as well. He's still not ready. But he will be most definitely, positively, absolutely be ready and start on Monday, April 4. Careful readers will note that's one week after he first said he'd be able to start.

Early Friday afternoon (April 1) Karl heads from home to the bar to do some work (I forget exactly what). Later that day, the truss company called and told us the trusses would be ready for delivery on Monday, April 4; the same day that Demo Guy was to finally begin work demolishing the roof. That seemed perfect to Karl and me but the Demo Guy wanted us to delay the delivery of the trusses until April 11. This said to both Karl and me that the demolition would take a week. (Considering the work, a week always did seem a little long; Demo Guy originally said the entire job would take two weeks. But I digress.)

Karl spent the weekend in Fresno doing various work on the bar. Monday morning rolls around and Karl heads to the bar in the early morning and meets Demo Guy and his crew. They start removing the roof and its trusses and, after a while, Karl leaves to let them do their work.

Later that day, Karl returns and finds the demolition complete. All of it. Trusses, old metal roof, old shingles, old sheathing all ripped off and put into a dumpster. The process that we thought would take a week took a single day. (A very long day, to be sure, but a day nonetheless.) This was a nice surprise! (But then why did Demo Guy want to wait a week to start putting up the trusses and why did he have us delay the delivery of the trusses a full week?)

The demolition broke a few things in the bar--glass counter top, a mirror, a speaker, drink rail, things like that--but that was nothing compared to the problems that were about to occur.



Since the bar was going to be without a roof for so long (upwards of two weeks) Karl wanted to sit at the bar over night to help prevent any vandalism that might occur if nobody was there to watch the place.  So, Karl spends the night on Monday sitting in his car staring at the bar.  Fun.

On Tuesday, we ask Demo Guy why he is leaving us without a roof for a week. Turns out Demo Guy was doing two jobs at the same time; ours and someone else's. I'm sure Demo Guy has his reasons for leaving us without a roof for a week but I don't know what they could possibly be. Looks to me that this guy seems to have a scheduling problem. It seems more logical to me to knock out one job before starting another. Is this guy so good that he's in this much demand? (Quite frankly, I doubt it; in my opinion, his attention to detail and concern for his clients seems a bit lacking.)

On Tuesday afternoon, we received the lovely "homo fagét" graffiti. And that was annoying and disturbing. I also see that there's a 30 to 70% chance of rain on Wednesday, Thursday and Friday. No roof and rain do not mix. Demo Guy has his guys off on his other job and I have no roof. We get in touch with the truss folks and they can deliver the trusses Wednesday afternoon. Why Wednesday? We want to try to get Demo Guy to start work on Wednesday afternoon in preparation of the 70% chance of rain on Thursday and we figured he'd be concerned about his client's project being damaged by rain. It was too late on Tuesday to get a hold of Demo Guy so we have to wait until morning.

For various reasons, we couldn't get a hold of Demo Guy Wednesday morning to see if he could start that afternoon. When we finally contacted Demo Guy, he said his crew could not work on our roof on Wednesday but would be working on our roof at 7:00am Thursday and, unless there's a downpour, they'd continue working to get us a roof. And, even if there was a downpour, we were assured that the crew would resume work when it cleared up.

Wednesday night, it rains. The bar gets wet. All of the bar gets wet. And Demo Guy didn't even bother to try to protect the interior with tarps or anything and didn't even offer to come help put up any sort of protection. (To be fair, we didn't either but that's not the point. The point is he didn't even seem concerned for anything but the pool table.)

Well, on Thursday Demo Guy's crew shows up at the crack of dawn again and beings working. A couple hours later, there was a 45-minute downpour and the crew left. Since Karl had been spending his nights at the bar keeping tabs on the place, he couldn't stay at the bar during the day; he had to sleep at some time, right? Before the downpour and after Demo Guy's crew had installed one truss, he went and took a nap. Mid afternoon, he gets up and heads to the bar to see what progress had been made after the rain had stopped. There was no crew working. The work had stopped, no progress had been made despite having no rain during the afternoon.

We called Demo Guy and asked him where his crew was. He did not know and could not get a hold of them! That's right, he did *not* know where his crew was and could *not* get a hold of them. To say that we were furious is a gross, massive understatement.

Demo Guy assures us up and down that, despite not knowing where they are, his crew will be there at 7:00am Friday to continue working and that his crew didn't come back on Thursday afternoon because "every time they picked up a saw, they were getting shocked" because the equipment was so saturated. (I thought, "SO IS MY BAR!!") (I don't mean to say that I wish his crew to be placed at risk of electrical shock, mind you.)

We have serious doubts about whether or not Demo Guy can even try to make good on his word about showing up on Friday morning; his track record is not exactly stellar in that regard. But, we can do nothing--literally--but believe him. What else could we do? Hire another contractor to finish the job? The place still had no roof. I'm sure we could have hired another contractor to finish the job but the annoyance of doing that would be unfathomably stressful for both of us.

Friday comes around and Demo Guy's crew shows up. I guess he finally figured out how to get a hold of his employees. Karl goes and lays down for his daily rest. Later that afternoon the crew finishes with the trusses and sheathing. The construction is complete in one day.

Also, ABC 30 comes out and does their piece on the graffiti. The police show up and assure us that they do, in fact, care about the (legally defined) hate crime of the graffiti. Ultimately, Friday ended up being a pretty great day for the bar. We simply love the vaulted ceiling (pictures coming tomorrow of that) and are thrilled to finally be at this point in the process.



In the end, Demo Guy scheduled two weeks for a job that only took two and a half days. Why he couldn't have just had the whole thing done by Wednesday before the rain started is simply beyond my comprehension. EVERYTHING was ready for him and he chose to delay things. He is the one who had us delay delivery of the trusses. He is the one with the apparent scheduling problems that made him unable to start when he first said he could. He is the one who couldn't communicate with his employees at a crucial time.

In all, the bar survived. The rain didn't cause too much obvious damage; there could still be some moisture problems with the drywall in the future but we're taking some proactive steps to help slow--if not prevent--that. It could have been a lot worse if the floor hadn't been concrete. But the problems and delays this guy caused for us are reprehensible and wholly unprofessional.

Tuesday, April 12, 2011

Lovely Sky Light

Now that the roof structure has been replaced and the building is once again as secure as it used to be, I think we can start showing what it was like with no roof on.

This is a lovely panorama of the "interior" from the front door.  (Notice the grafitti on the mirror from the guy who doesn't know how to spell the things he hates so much.)  This image was captured one week ago today.



(I'm starting to really like the panorama mode on the smartphone...)

Tomorrow's post deals with the sheer pain and suffering of not having a roof on the bar in the middle of rain storms and assorted, well, BS.  It will go a long way to explaining why last week really, really sucked so badly.

Monday, April 11, 2011

Roof Framing Completed!

Phew!

The new roof is on.  We still have to have the shingles put on but the major construction and destruction is complete.

Last week, we avoided saying much of anything about the roof demolition and rebuild.  We didn't really like keeping y'all in the dark so much but we thought it would be best to not put on the internet the fact our roof was completely gone and it was really easy to get into the "building" and really wreak some havoc.  I'm thinking broken mirrors, broken glass, destroyed bar, and the like.  Not to mention it would have been really easy to knock down at least one of the walls and cause a huge headache for us.

We'll be posting pictures of what the process looked like in the next several days.  We're both glad to have this part done.

Monday, March 28, 2011

Wide Open Space

(Ok, not so wide and open, I guess.)

Got the stuff we don't want in the bar during construction out of the bar.  Demolition of the roof can begin whenever they're ready to start.  (Whenever that turns out to be....)

Here's a blurry panorama of the bar ready for work.  Wave hello to Karl at the window.

Friday, March 25, 2011

On your mark,... Get set,...

Everything is now at the point of being ready but the weather. But good news is on the horizon. Clear weather is forecast for Monday. Can we believe the forecast? They have been wrong so many times before.

The construction people are what I consider vague. There are many calls back and forth about when they will start. I am told something could start happening Monday. At least we will get a big trash dumpster and the A/C unit will be taken down.

Just seeing the outside of the building change will be such a joy. This excludes the changes that were made by graffiti taggers. Those changes we could do without.

Tuesday, March 22, 2011

The $10,000 Piece of Construction Paper

Phew!

Three months and four days after we started the process with The City of Fresno to get the building permit and after spending darn close to $10,000 on various services, government fees, and probably a few other things I've completely forgotten, we have our building permit.

I feel like I can finally relax for a bit.  I can't.  But I feel like I can.

Both Karl and I have been waiting until we had a permit in our grubby little hands before we made any real construction plans.  And he's been on the phone today with the contractors that will be working first.  A/C guy, demolition guy, and the truss guy.  (No, not the truss your grandfather wore.)

As early as next week you'll begin to see some actual physical work on the bar as you drive by.

It's a great relief to finally be at this point.

Here, Karl is holding the $10,000 sheet of construction paper.

Thursday, March 3, 2011

Status Update

Earlier this week, I quietly put up a new page on our web site sort of giving a rough-to-detailed outline of where we are in the process.  It gives a quick look into the current state of affairs as well as what needs to happen before we open and what has already happened.

It's the Building Status page.  Give it a look-see.

(There has been a lot that has already been completed.  Since I made that list at the end of February, I'm certain I forgot things that had to be done but have been completed.  The "Not Yet Begun" parts should be fairly complete, though.)

Tuesday, February 22, 2011

Baby Steps

A guy was supposed to meet me at 3 in the afternoon at the bar to replace my truck's windshield.  (It had been broken for close to 10 years, I think).  Just before three, he called to say he was running late and would be at the bar in about 45 minutes.  He didn't show up until quarter after four.  Yay. 

So while I waited for him to get there and while he was working on the truck I spent some time kinda cleaning up the place.

We wanted to save the drink hangers over the bar and not have them end up with the rest of the roof.  In removing them it turns out that the easiest thing to do was to remove the wood panels and scalloped trim and the associated wires and other....stuff....that was up there.  This is what it looks like after all that was removed.  (Pictures from my crappy cell phone camera.)





I really don't think the tiny bits of work that gets done on days like yesterday really make that much of a difference.  But at least it makes me feel like something is getting done while not actually doing anything.